I was planning to pre-order the Framework 16 for next year, but my old computer just bricked on me :(
Of course, I need a computer asap for school and my projects, and the Framework 16 only ships in march-april. What’s your experience with shipping delays of your orders ? Is there a secondary market where previous batches are still available ? Am I missing something here ?
I could buy an off-the-shelf computer, but I’m not keen on it and would rather avoid waiting 4-5 (the lifespan of this new computer) more years before getting my Framework.
Thanks for your answer. I would love to fix it/ get it repaired, I’m just a little out of my depth diagnostic-wise.
Here’s what I did so far :
A couple months ago, it started having issues charging. There was a false contact on the connector that required me to put it at a certain angle to charge. When it worsened, I got the power supply connector replaced.
After this repair, the battery was no longer charging. I opened it up to check if the battery was correctly connected to the board, and it was. The battery was just not picking up charge anymore.
A few days ago, I was using it for a few hours (I was playing at that time, so temp might have got a bit high), when it abruptly turned off, as in the power supply was disconnected.
After this, I let it cool down, tried turning it back on while plugged, with and without the battery. No luck this far.