• 0 Posts
  • 2 Comments
Joined 1 year ago
cake
Cake day: November 2nd, 2023

help-circle

  • 2-3k to paint existing cabinets, new hardware 4-5k epoxy floor and countertops 4-5k new appliances 3-4k left for drywall, paint, lighting, trim, framing, hvac, plumbing, electrical.

    She could have gotten more for less but not by much when you are hiring it all out. Doesn’t even look like she touched the tile backsplash, which would be 1-2k more.

    I remodel kitchens in the midwest, and we would charge a lot more than that for this size kitchen. She clearly didn’t spend for a designer, though.