sabreW4K3@lazysoci.al to United Kingdom@feddit.ukEnglish · 9 hours agoSmart meters to cost the UK billions: 2G switch-off means replacing 12-13 millionwww.theregister.comexternal-linkmessage-square12linkfedilinkarrow-up118arrow-down10file-textcross-posted to: technology@beehaw.org
arrow-up118arrow-down1external-linkSmart meters to cost the UK billions: 2G switch-off means replacing 12-13 millionwww.theregister.comsabreW4K3@lazysoci.al to United Kingdom@feddit.ukEnglish · 9 hours agomessage-square12linkfedilinkfile-textcross-posted to: technology@beehaw.org
minus-square9point6@lemmy.worldlinkfedilinkEnglisharrow-up3·5 hours agoOh really, I thought GSM-R was very much based on 2G, and is/was subject to the same switch off dates I’m not gonna pretend I know loads about that though
minus-squareGhoelian@piefed.sociallinkfedilinkEnglisharrow-up1·2 hours agoIt’s not the same as 2G, but it is based on 2G. That’s where the GSM part comes from.
Oh really, I thought GSM-R was very much based on 2G, and is/was subject to the same switch off dates
I’m not gonna pretend I know loads about that though
It’s not the same as 2G, but it is based on 2G. That’s where the GSM part comes from.